Driveway Crossovers in Sydney: Approvals, Widths and Who Can Build Them

·4 min read·Dominate Concrete

The crossover, the strip of driveway between your front boundary and the kerb, is on public road, so it needs council approval under the Roads Act 1993 even when the driveway on your land doesn't. Councils set its width, levels and finish, many inspect the formwork before any concrete goes in, and some only accept contractors from their own approved list.

New concrete driveway crossing joining a sloped kerb at the street
Photo: Christopher Ziemnowicz, Public domain, via Wikimedia Commons

What counts as the crossover

A crossover (also called a vehicle crossing, driveway crossing or footway crossing) has three parts: the layback, where the kerb dips so wheels can roll over it; the section across the nature strip and footpath; and the join at your boundary. On your side of the boundary you're building a driveway. On the road side you're building to council's standard drawings, on council's land.

Plan of a driveway crossover: your land, the front boundary, the council footpath and nature strip, the kerb layback and the roadYour landDriveway, often exemptDrivewayFront boundaryCrossing: councilapproval neededFootpathNature strip2m+1m+Stormwater pitLayback in the kerbRoadTypical figures; your council sets the rules
The crossing runs from your front boundary to the kerb, across council land. The clearances are common examples: many councils want about 2m to a street tree and 1m to pits and poles.

NSW-wide

How approval works

Each council runs its own process under its own name: a Vehicle Access Application in North Sydney, a Residential Vehicle Crossing Application in Bayside, a 'Vehicular Crossing Construction by Private Contractor' application in Canada Bay. The steps are similar everywhere:

  1. Get the levels. Council issues the levels your driveway has to meet at the boundary. Sutherland Shire calls them Property Alignment Levels and says to allow 4 to 6 weeks. Northern Beaches asks you to apply for street levels before changing a driveway.
  2. Apply for the crossing. The application goes in with plans and council's fee.
  3. Use an approved contractor where required. Northern Beaches and Sutherland Shire only accept crossings built by contractors on their registers.
  4. Book the inspections. Several councils inspect the formwork and mesh before the pour and again at the end. Bayside needs 24 hours' notice; Northern Beaches asks for 3 working days.
  5. Build to council's standard. Thickness, mesh, concrete strength and finish follow council's specification, not the driveway's.

Repairs count. Canada Bay, for one, requires approval to repair or replace an existing crossover, and a development consent for a new house doesn't cover the crossing.

Width, trees, pits and corners

Where a crossing can go and how wide it can be varies more than most people expect. Across the councils we've checked, the patterns are:

  • Width: a single crossing is typically 2.7m to 3.5m at the boundary. City of Sydney caps driveways at 2.7m and Ku-ring-gai crossings at 3.5m, while Georges River and Bayside allow up to 4.5m for a house.
  • Street trees: most councils want the crossing about 2m clear of a street tree trunk, and very few will remove a healthy tree for a driveway.
  • Pits and poles: commonly 1m clear of stormwater pits and power poles. Moving a pit is at the owner's cost.
  • Corners: on a corner block, the driveway usually has to start at least 6m from the kerb tangent point.
  • Number: one crossing per house in most areas. A second needs a wide frontage (15m in Cumberland, more than 18m in Ku-ring-gai, 20m in Camden) or a development application.

The crossing rules from four councils, each with the clause it comes from:

  • One vehicle crossing per lot (granny flats don't get a second). Crossings are a maximum of 3m wide for a single garage or no garage and 4.5m for a double garage, and each lot in a duplex or triplex gets a maximum 3m crossing.Source: Fairfield Policy 0-088, requirements
  • Crossings must be at least 6m from the tangent point at an intersection, 0.3m from the neighbour's driveway and wholly within your frontage. Old laybacks must be removed and replaced with standard kerb.Source: Fairfield Policy 0-088, clauses 6–7
  • Where there's no footpath, the nature strip either side of a cut-in driveway must be battered no steeper than 1 in 14, and the footpath slope can't exceed 5% along its length. Moving pits, hydrants or stormwater outlets is at the owner's cost.Source: Fairfield Policy 0-088, requirements
  • Maximum driveway width on the road reserve is 4.5m, and existing wider driveways must be brought down to 4.5m when the property is redeveloped (including under a CDC). One driveway per single-dwelling lot.Source: Georges River Pol-066, 2.1–2.2, 2.5
  • On corner blocks, driveways can't be within 6m of the kerb tangent point. If the driveway is within 3m of a street tree you may need a consulting arborist's report, and the owner pays for any approved tree removal.Source: Georges River Pol-066, 2.3, 6.1–6.3
  • DAs involving driveway works must include a driveway profile with levels from the road centreline to the boundary, V-grates in the gutter are only approved where there's no alternative, and any strip drain across the driveway must sit inside the property boundary, not in the road reserve.Source: Georges River Pol-066, 4.1–4.2, 5.4–5.5

Our region pages list the rules for every council we cover: Inner Sydney, Eastern Suburbs, Inner West, North Shore, Northern Beaches, Western Sydney, Hills District, South Sydney, South West Sydney.

Finish and construction

The crossing is built to council's specification, which is usually heavier and plainer than the driveway. Campbelltown, for example, specifies at least 125mm of 25 MPa concrete with F62 mesh at 50mm cover and a broom finish. Most councils insist on plain concrete because that's what they'll use if they or a utility ever have to dig it up, which is why decorative driveways usually stop at the boundary.

Costs and timing

Council application and inspection fees are separate from the concrete work and differ between councils, so check your council's fees and charges. Our calculator and cost guide don't include them. Time is usually the bigger cost: between levels, approval and inspection bookings, allow several weeks, and start the paperwork before booking the driveway.

If the existing crossing is sound and in the right place, keeping it avoids the crossing approval altogether. The new driveway is built up to the boundary and joined to the old crossing with an isolation joint, though the work on your land may still need its own approval if it isn't exempt.

Planning a concrete job?

Get your personalised quote from a vetted, licensed concreter near you.

Common questions

Do I need council approval to replace my driveway?

For the crossover, yes. For the part on your land, a like-for-like driveway is often exempt development in NSW, but not in a heritage conservation area or on a heritage item, in a foreshore or environmentally sensitive area, or if it isn't built to AS/NZS 2890.1. Some councils treat wider driveways as car parking that needs a development application.

Can I use any concreter for the crossover?

Some councils, such as the City of Sydney, let you use your own contractor once you hold a permit. Others, including Northern Beaches and Sutherland Shire, only accept crossings built by contractors on their approved register.

Sources

Prices in this guide come from our concrete price calculator and update when its rates are reviewed. They are estimates, not fixed quotes: the final price is confirmed at a free site inspection. Council rules were checked against each council's published policy and can change, so confirm with your council before you build.